Visited Ittina Mahavir to check out the status of the flat of my friend Sharat.

Facade/outer gate: Still not completed. Met the security guy at the makeshift gate, he directed me to the site office inside. While moving inside, i noticed few buildings in the front have been colored from outside and people have started living in.

The site engineer guy was assigned to show me the flat.

The guy told me, the moment the amount is paid, they will get the flat ready in 20 days (which i doubt, because it will take in access of 45 days)



The entire project the guy said will be completed in 7 months, but seeing their attitude it might take another two years to complete



Photo 1: View of Hall from the front door


Photo 2: Grill View of Hall on the left hand side

Photo 3: Peak into Children's bedroom from Hall





 Photo 4: Balcony of Children's bedroom

Photo 6: flooring of bedroom 




Photo 7: Kitchen

Photo 8: Utility Area

Photo 9: Common Toilet

Photo 10: Master bedroom with the balcony and toilet


Photo 11:  Grill of the Bedroom


Photo 12: fittings (not done)








Photo: View from inside the door (lift in progress)
Photo: Stairs



Photo: filthy water Just outside the door near the lift


Photo: View from the ground floor of building


Photo: Elevated
 the third floor on the right is the flat we saw

Photo: View from inside the door (lift in progress)
Photo: nearby buildings


Photo: near by buildings


Photo: Swimming pool is completed by filled with dirty water


Photo: Another view from entrance