Visited Ittina Mahavir to check out the status of the flat of my friend Sharat.
Facade/outer gate: Still not completed. Met the security guy at the makeshift gate, he directed me to the site office inside. While moving inside, i noticed few buildings in the front have been colored from outside and people have started living in.
The site engineer guy was assigned to show me the flat.
The guy told me, the moment the amount is paid, they will get the flat ready in 20 days (which i doubt, because it will take in access of 45 days)
The entire project the guy said will be completed in 7 months, but seeing their attitude it might take another two years to complete
Photo 1: View of Hall from the front door
Photo 2: Grill View of Hall on the left hand side
Photo 3: Peak into Children's bedroom from Hall
Photo 4: Balcony of Children's bedroom
Photo 6: flooring of bedroom
Photo 7: Kitchen
Photo 8: Utility Area
Photo 9: Common Toilet
Photo 10: Master bedroom with the balcony and toilet
Photo 11: Grill of the Bedroom
Photo 12: fittings (not done)
Photo: View from inside the door (lift in progress)
Photo: Stairs
Photo: filthy water Just outside the door near the lift
Photo: View from the ground floor of building
Photo: Elevated
the third floor on the right is the flat we saw
Photo: View from inside the door (lift in progress)
Photo: nearby buildings
Photo: near by buildings
Photo: Swimming pool is completed by filled with dirty water
Photo: Another view from entrance